17 Jan

January 17, 2022 10:44 am Published by

On the 17th of January, a low loader will be arriving to site via Blythe Road at 6:30am, this is required to arrive at this time due to vehicle size and movement orders. This will be delivering the sheet piling rig ready for commencement of Central core works. The rig will be tracked off the low loader and parked up until works start at 8am.

Categorised in:

This post was written by Victoria

Comments are closed here.