12 – 14 April
July 29, 2022 9:22 amFurther to previous notices we can confirm that this week we will be progressing with piling activities. We have three large piles to install, which will require working out of hours on the evenings of Tuesday 12th, Wednesday 13th, and Thursday 14th April.
Works will begin at our usual time of 0800 and from this time we will be drilling the pile and installing the reinforcement cage.
Between 1600 and 2300 we will pour concrete into the formed pile bores. This activity will require concrete to be poured through the tremie (a pipe dropped into the pile), requiring regular concrete deliveries. These activities will be supported by an electric crawler crane and a super silent jet washer. Finally, between 2300 and 0000, a plunge column will be installed which will require the use of an electric crawler crane only
These works will be taking place behind the Central retained façade on Hammersmith Road, offering both noise and visual shielding. During dark hours we will have flood lights in use, however these will be carefully placed, facing inwards and angled, to cause as little disturbance as we can to residents.
Working out of hours is never favourable, and so we would like to thank you for your patience and cooperation.
Should you wish to contact us for any reason, please do so via updates@olympia.co.uk
Categorised in: Archives
This post was written by Victoria
Comments are closed here.